|
| Who would be the voluteer to install the 4th yagi?
L-R: Zoli (Z32C), Igor (Z32ID), Dime (Z35Z).
(Poor Dime got a sunstroke during the installation, he was in bed for 2 days.) |
|
|
| 75% of the work is done. What does it mean? Nothing, without the 4th we can not work. |
|
|
| Igor was the volunteer to intsall the 4th yagi. |
|
|
| Well done. Finished at 13:00 = 1 hour before the contest.
L-R: Igor Z32ID, Peko Z31EF, Zoli HA1CA/Z38C |
|
|
| Contest start, 14:00 UTC. It was the 1st time, when I was ready for a contest in Z3 from the official starting time. :-) |
|
|
| Hahooo... Who would like to be nr. 2?
(The target is min. 70 QSO) |
|
|
| Behind the right window is the QTH. |
|
|
| Contest set up. FT-847, TR-144H transverter, MFJ-434 voice keyer, RIGBLASTER PRO (using its sequencing control possibility), TRS 4 step sequencer from DEMI, MICROSET SR100 PA (100W), ME1500-V PA (1kw+, GSZ35B) |
|
|
| Set up in other angle. Right to the monitor is DC-145-2H filter for the RX side (to be sure). |
|
|
| FT-847 |
|
|
| TR144H (serial number 014) |
|
|
| North direction. |
|
|
| East direction (1700m mountain). |
|
|
| Amateurism... On open air koax switch and preamp can breathe. |
|
|
| 6 el. YAGI, DK7ZB design (2.6m version). Tuning was easy by shortening the radiating element. |
|
|
| Sunshine was over. Storm is coming... |
|
|
| Getting the wheather worse. |
|
|
| Well, the tower may need some painting? |
|
|
| North. Nice scenery. [it would be ever nicer without the hill :-)] |
|
|
| East. Nice scenery. (But not for 2 meter contester). |
|
|
| South-east. It doesn't matter, anyway 0 QSO expected from this direction. |
|
|
| Seems like a church (in Susevo, north from the airport), under construction. |
|